Calendar

    <<  February 2010  >>
    MoTuWeThFrSaSu
    25262728293031
    1234567
    891011121314
    15161718192021
    22232425262728
    1234567

    View posts in large calendar

    Categories

    Disclaimer

    The opinions expressed herein are our own personal opinions and may not represent truthines or reality in any way.

    Installing Tank Inspection Ports

    I wrote about cleaning the tanks before, here’s a great shot that sums up installing the Seabuilt inspection port. Using the rubber gasket you pick your spot, find the center and mark all the bolt holes. Then you cut a hole in the tank and drill out all the bolt holes. Clean up the edges of any loose material and you’re done!

    The piece on the right hand side folds in-half and slides into the tank. The second gasket and the solid top piece go on top and is held in place with 1/2” nuts and lock washers.

    DSC_7493
    Tags:
    Categories: Systems - Plumbing

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    New Portlights

    When we bought our Pearson 424, we knew right off the bat we had to replace the portlights and the teak eyebrow trim along the outsides of the cabin top. The existing portlights were old and leaked causing the interior teak veneer to delaminate, no structural issues. The plastic windows were also hazed over and they just looked poor. At the 2009 Seattle Boat Show we made the first decision towards the beginning of this big project in that we purchased our new portholes from New Found Metals, located in Port Townsend, WA. Its always nice to be able to support local businesses.

    The new portlights are either slightly larger (in case of the 5”x12”) or much larger than the existing portlights so there is some work to enlarge the holes once the existing portlights are removed. Doing all of this prep work is actually really easy using the templates provided by New Found Metals. You clamp the template in place, trace your lines and cut out the new hole. You also use the template to drill all the holes for thru bolting the portlight to the outer trim.

    One time consuming piece is handling the bolts. You have to custom cut the bolts that attach the portlight to it’s outer trim. Every hull is a different thickness so they can’t really stock every possible length. I used my handy vise, cut them with the Fein Multimaster, cleaned them up with the dremel and a sanding wheel and then used two bolts to ensure the threads were clean. Here’s a video of that process.

     

    As we’re replacing the portlights, we’re also putting up new wood along the interior teak along the insides of the cabin top. We will match the new headliner to this when we replace that as well. Painting it all white will brighten the boat considerably and visually make the cabin feel a bit taller. We’re using 1/4” plywood, primed on the finished side at the workshop prior to installation. We epoxy the new wood to over the top of the existing wood. That is a pretty involved process of making a paper template, cutting out the new pieces, dry fitting them (which involves a lot of tweaking) then making the cut outs for the portlights and then finally epoxying the new wood in place.

    Here are a bunch of photos which roughly chronicle the process. Click thru for larger pics or to see more. They look awesome, the glass is so clean and clear I keep thinking they’re open!

    DSC_7485 DSC_7494    DSC_7495  DSC_7511


    Tags:
    Categories: Systems - Hull | Projects | Destinations - Port Townsend, WA | Interior

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    Wish Lists

    Photos

    www.flickr.com
    deepplaya's items Go to deepplaya's photostream

    Corinthian Yacht Club