Calendar

    <<  September 2010  >>
    MoTuWeThFrSaSu
    303112345
    6789101112
    13141516171819
    20212223242526
    27282930123
    45678910

    View posts in large calendar

    Categories

    Disclaimer

    The opinions expressed herein are our own personal opinions and may not represent truthines or reality in any way.

    Installing Tank Inspection Ports

    I wrote about cleaning the tanks before, here’s a great shot that sums up installing the Seabuilt inspection port. Using the rubber gasket you pick your spot, find the center and mark all the bolt holes. Then you cut a hole in the tank and drill out all the bolt holes. Clean up the edges of any loose material and you’re done!

    The piece on the right hand side folds in-half and slides into the tank. The second gasket and the solid top piece go on top and is held in place with 1/2” nuts and lock washers.

    DSC_7493
    Tags:
    Categories: Systems - Plumbing

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    Cleaning the Tanks

    The fresh water system was less that sterile when we bought the boat and we've done a lot of work to raise our water quality. I’ve already talked about replacing all of the plumbing hoses throughout the boat, new faucets, shower, installing a system wide water filter, etc. The last step in all of this is to really clean the tanks.

    Pearson 424s have three tanks. 60 Gallons port and starboard under the salon settees and a 50 gallon bow tank. Our bow tank was decommissioned by the P.O. and used as anchor locker. The salon tanks are fiberglass and are structural to the hull, have three internal sections with baffles between each. They are fed by deck fill plates connected to the tanks on the upper foreword end of thanks. There are overflow hoses as well, that I need to go through and ensure they run into the bilge, according to the other P424 owners they were vented into the lockers (lame).

    Our port tank has a single 6” aft Beckson deck plate. This is a screw-out plate that is not water or air tight under pressure. The starboard tank has three such plates one in each section of the tank. Eventually, I want to replace all of these with stronger inspection ports and add real gauges so we don’t have to disassemble the settees to look in the inspection port to see if they are full. For now, we’re adding two Seabuilt stainless steel inspection ports to the port tank. I’ll replace the others when there’s not so many other things going on.

    The parts have been ordered and I’ll work on getting them installed this coming week\weekend so we can clean the port thank.


    Tags:
    Categories: Systems - Plumbing | Projects

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    Weekend of Prepping Spars

    Al Lou Mini Um

    Dawn and I have started our annual cleanse diet which kind of messes with you with the first couple of days (headaches, low energy, weird tummy stuff) but now we’re back to more normal energy levels. We’ve still managed to be down at the workshop though cleaning up some of the aluminum ends from the spars.

    Once they are cleaned up we’ll take them over to Asko for galvanizing.

    This weekend we’re also going to drill tap and dry-fit all of the electronics we plan to attach to the spars. That sounds pretty simple, but first I have to round up all the bases, get bolts, and then I can start the drilling, tapping, etc. When I am done that I’ll give the green light to to do the final prep and paint the spars.

    The final plan for the weekend is to complete some more hose installations including the new strainer for the anchor washdown.

    Should be a good weekend of getting stuff done and eating super cleanse healthy.


    Tags:
    Categories: Projects | Systems - Electronics | Systems - Plumbing | Systems - Rigging

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    New Year, Same boat projects

    Ticked a few things off the to do list the past few days.

    New Years Eve day, Dawn worked on the masts and booms filling all the holes we don't need anymore with Belzona 1111. Thanks to at for helping us get started. Dawn is really good at these kinds of projects that require being neat and detailed oriented. I'm better at breaking things an making a mess.

    The bilge hoses have all been replaced. This took a little longer than planned because I used stiffer hose which added some unforeseen complexity. It also became delayed due to an apparent shortage of 316 SS hose clamps in the size I needed. Fisheries Supply in Seattle is horrible at managing their stock, but their prices are better than West Marine. Included in this a Perko bronze strainer for the manual bilg pump and an inline check-valv on the stern end of the seconday\large bilge pump. I am considering walling off the aft-most section of the bilge to minimize the area which stays wet. We would place the primary pump in that section but if we had more water than that then it flow over the wall and we would kick on the secondary pump. We also need to put a float switch on the primary bilge pump, currently it is only enabled by the breaker switch.

    The Walter Machine RV-20 V-Drive has a raw water cooling chamber on the top of it which is prone to corrosion. Eventually it can corrode through allowing sea water to mix with the oil in the bottom half of the v-drive where all the gears are. This would be bad. Several owners have cleaned up the corrosion and used Marine-Tex to protect the area before hooking everything back up. Some owners (including my surveyor who also owns a Pearson 424) have removed the raw water cooling altogether. The corrosion in my unit is so bad that it damaged one of the bolt holes used to attach the top plate to the v-drive so I am going the route of leaving the unit dry. So now instead the raw cooling water going from the strainer to the v-drive and then to the egine it now goes directly from the strainer to the engine. I will install a temperature gauge on the v-drive to monitor it for overheating and I left the hoses in place so I could hook it up back if it ever did overheat. Eventually we will probably replace the v-drive, but that is not something we wanted to do right now.

    I have not finished this yet, but the anchor washdown pump was not protected by a strainer. I purchased all the hoses, clamps and the Sherwood strainer. This will get installed completed tomorrow. I would have finished it today, but I forgot to buy the mounting bracket.

    I also capped off the vent thru-hull that used to be part of the holding bag system. I will also being putting a plug on the inside portion of the deck fiting for pumping out. I thought about removing and glassing these closed, but I don't this it's neccesary, capping them of is adequate redundance. I also put a plug in the thru-hull I eventually plan to use for the water maker. It has a ball valve, but I like the added security of the plug as well. This is something we'll do just before we plan to leave.

    All in all it was nice to tick a few thing off the list, but we still have a ways to go!


    Tags:
    Categories: Projects | Systems - Engine | Systems - Hull | Systems - Plumbing

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    Next set of things in the refit

    The boat has been moved form sitting in the yard where the bottom was prepped and painted, some keel damaged was repaired (oopsy), the v-berth was prepped by me, and the windlass was removed. The boat is now sitting inside the prep tent. I’ve not been to it yet, but I’ll go tomorrow and take a bunch of pictures.

    from gave me a call about some blisters he saw along the waterline. We’re not sure if it’s just a paint issue or if there is some gelcoat damage. We’ll know more when they start to prep for painting. This is one of those “known unknowns” which could be nothing or could be expensive. We’ll find out soon enough.

    The yard is prepping the boat for repainting the stripes, and I aguess polishing the hull as well as a bunch of fiberglass projects including closing up some thru-hulls, reinforcing the v-berth and moving the windlass. I also have a lot of chores to do:

    • Grind off a thru-hull so it can be pushed in and then glassed closed.
    • Remove the teak trim from the deck where the windlass was removed.
    • Cleanup the water jacket in the VDrive and sand off the corrosion on the input shaft.
    • I have a lot of measuring to do to determine the wire lengths needed for the new electronics and mast lights. I’ll start with just the lengths needed for the masts plus some extra so I can put in terminal blocks or connectors which will allow the masts to be pulled without cutting any wires.
    • I also want to work on replacing the hoses below the waterline. I’ll pull the hoses, measure them and pickup new hose from Fisheries or West Marine.
    • Dawn is probably going to star on the portholes or at least getting all of the pieces in place to make it happen.

    Very busy weekend!!


    Tags:
    Categories: Projects | Systems - Engine | Systems - Hull | Systems - Plumbing

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    Wish Lists

    Photos

    www.flickr.com
    deepplaya's items Go to deepplaya's photostream

    Corinthian Yacht Club